Spesifikasi Cluster Bukit Bougenville
Pondasi | : Batu kali |
Dinding Depan | : Bata merah |
Dinding | : Batako diplester dan dicat |
Lantai | : Keramik |
Plafon | : Gypsum |
Rangka atap | : Baja ringan |
Atap | : Genteng beton |
Kusen | : Full allumunium |
Pintu | : Full engineering door |
Daun Jendela | : Full Allumunium |
Kamar mandi & WC | |
- Pintu | : PVC |
- Dinding | : Keramik 150 cm |
Sanitair | : Shower, closet duduk |
Listrik | : 1300 Watt (realisasi sesuai jadwal PLN) |
Air bersih | : PDAM |
Spesifikasi Cluster Bukit Aster
Pondasi | Batu Kali |
Dinding | Batako, diplester dan dicat |
Lantai | Keramik |
Rangka Atap | Baja Ringan |
Plafon | GRC/Setara |
Atap | Genteng Beton |
Sanitair | Shower, Closet jongkok |
Pintu Depan | Semi Panel (tipe 38 & 47) Double Triplek (Tipe 21, 22, 30, 36) |
Kamar Mandi & WC | Pintu PVC & Dinding dicat minyak |
Instalasi Listrik | 1300 watt (tipe 30, 36, 38, 47) 900 watt (tipe 21 & 22) |
Air Bersih | PDAM |